Saturday, April 7, 2018

April 7, 2018 Project Update

A quick photo update to catch up on the work being done for the Jurassic Bedroom:

Most of the clouds have been painted on the walls and ceiling, although some shading still needs to be done.

The tropical-looking fan was the first thing installed, back when we moved into the townhouse 2 years ago.

Storm clouds in the T-Rex fence section of the room.

I think the reason my wife OK'ed this bedroom remodel was so she could buy a scroll saw.

JP Gate (bedroom doorway) arch cut and ready to paint.



Bathroom sign cut and painted.

In-progress shot of the gate side-rails.

We ripped off the moulding around the door frame to add the gate.


First layer of paint on the lettering

Rough assembly of the doorway/gate.



No comments:

Post a Comment

Jurassic Bedroom is done!! (almost!)

With the exception of the curtains and a Mr. DNA quilt that my wife is working on, the Jurassic Bedroom is COMPLETE!  Those little details w...